
Home Renovations · Bathrooms and ensuites
Bathroom renovations in Sydney, waterproofed like a new build.
We take the bathroom back to the frame, put right what we find, waterproof it with four coats and two puddle flanges and grout every tile with epoxy. One bathroom, the ensuite as well, or the floors and rooms around it, all on one fixed price or lump sum contract. A typical bathroom renovated where it is costs about $30,000 to $45,000, depending on the fittings and finishes you choose.
Fully insured
Bathrooms, and what comes with them
Most bathroom jobs are more than the bathroom.
People call about the bathroom. When Stav walks through, there is usually more on the list: an ensuite the same age, a floor lifting outside the door, a laundry that shares the wall. Strava Group is a licensed renovation builder, so the bathroom can be done on its own or with the rest, as one job on one programme and one contract.
A bathroom carries more trades per square metre than any other room. Demolition, carpentry, plumbing, wiring, waterproofing and tiling have to happen in the right order and be checked at each step, and that is what a builder is for. We renovate:
- Main bathrooms
- Ensuites and powder rooms
- Laundries
- New floors through the house
- Showers, toilets and basins moved
- Whole-house renovations
If the bathroom turns out to be the start of something bigger, see home renovations in Sydney.
Your renovated bathroom gets the same waterproofing as a new build.

Start here
Tell us about your bathroom.
Send a few details and a photo or two if you have them. Stav calls within a few business hours to book a time at your home.
- Tell us what the bathroom needs, and anything else on the list
- Stav calls within a few business hours and books a visit
- He looks at the bathroom, the floor under it and the rooms around it
- You get an itemised fixed price or lump sum quote
Your project
What are you planning?
Tap one and finish the rest in under a minute.
Call 0450 605 080No cost and no obligation.
Quick Answer
A typical bathroom renovated where it is costs about $30,000 to $45,000. Where it lands depends mostly on the PC (prime cost) items, such as the vanity, tapware, toilet and shower screen, and on the tiles and finishes. Moving the shower, toilet or basin or changing walls adds to that. You get an itemised fixed price or lump sum quote after a site visit.
Before you compare quotes
Redo it better, or redo it again.
Nobody redoes a bathroom for fun. Most of the bathrooms we redo have failed: a leaking shower, drummy or lifting tiles, a stain on the ceiling below or a soft floor. You have paid for that bathroom once already, so this time the point is to build one that outlasts it.
When you compare quotes, ask each builder how many coats of membrane go down, how many puddle flanges, whether the screed is reinforced and which grout they use.
What we renovate
Bathrooms, ensuites and the rooms around them.
How each kind of job usually goes in a Sydney house.
Bathroom renovations
Back to the frame
Tiles, sheeting and the old floor bed come out, so we can see the frame and the floor. Timber that has rotted under an old leak is replaced, walls are straightened, and extra noggins go in where the vanity, mirror and shower screen will hang.
Ensuites
Two wet areas, one programme
An ensuite that went in with the main bathroom usually wears out with it. Doing both together keeps the plumber, waterproofer and tiler moving from one room to the next, and the cost per room comes down. One at a time works too: we start with the one that worries you most.
Laundries and floors
The rooms next door
A laundry that shares the bathroom wall, or a floor that runs past the bathroom door, is easier to do while the trades are already there. It goes in the same quote, priced line by line.
Layout changes
Moving the shower or toilet
Moving a shower, toilet or basin means new drainage and a new membrane, and sometimes a wall moves too. We check the floor and where the pipes can run before we price it.
First site visit
What we check before we price a bathroom.
A bathroom quote is only as good as what was checked first.
The floor
Under the old tiles
Signs of an old leak around the shower and the toilet, soft spots, and whether the floor is timber on bearers or a concrete slab, which changes how the new floor is built up.
Asbestos
Behind the old sheeting
Homes built or renovated before 1990 are likely to contain asbestos, and older bathrooms often have fibro sheeting behind the tiles. Where the rules require it, a licensed removalist takes it out and the area is cleared before work goes on (SafeWork NSW).
Plumbing
Where the water goes
The age of the pipes, the falls to the floor waste, and where the drainage can run if anything moves.
Approvals
Townhouse or house
In a townhouse, the owners corporation has to approve a bathroom renovation before work starts. In a house, inside work that leaves the structure alone is often exempt development and needs no approval (exempt development rules). We confirm it for your home before we quote.
From our jobs
Bathrooms finished, and before the tiles.
Finished bathrooms and ensuites, and two bathrooms at the waterproofing stage, captioned for what they are.






How the job runs
From the first visit to handover.
One bathroom is about 4 to 8 weeks on site. You get the programme with the quote, before you sign.
Stav calls within a few business hours, then looks at the bathroom, the floor and the rooms around it with you. You get an itemised fixed price or lump sum quote, with any provisional sums on their own lines.
How we waterproof
Four coats, two puddle flanges, epoxy grout.
Waterproofing disappears under the tiles for good, so ours goes past the minimum and is documented before it is covered.
Two complete membranes
We grind the concrete back 2 to 3mm so the membrane bonds to clean, sound concrete. Every wet area then gets a four-coat system: two coats under the screed and two on top. If water ever gets past the top layer, there is a second full membrane underneath to stop it.
A puddle flange at both levels
The puddle flange seals the membrane to the floor waste. AS 3740 asks for one, under the screed. We fit a second at the top of the screed, so both membranes are sealed to the drain.
Water stop before the jambs
The water stop angle at the doorway runs the full width of the opening, so it goes in before the door jambs.
A reinforced screed
The screed between the membranes is reinforced with fibre or mesh, so it resists cracking and keeps both membranes protected.
Photographed before it is covered
Each stage is photographed and signed off on a checklist. At handover you get the waterproofing certificate and the photos, and you are welcome to bring your own inspector after waterproofing and before the screed.
Epoxy grout as standard
Every tile is grouted with epoxy. Cement grout is porous: it soaks up water, stains, cracks with time and needs resealing. Epoxy grout does not absorb water, resists stains and needs no sealing, so the joints stay as tight as the day they went in.
The full method, and why each step is there: how we waterproof wet areas.
Honest numbers
What a bathroom renovation costs in Sydney.
| Item | Typical range |
|---|---|
| Bathroom renovation, typical room renovated in place | $30k to $45k |
| Shower, toilet or basin moved, or walls changed | Priced after the site visit |
| Time on site, one bathroom | About 4 to 8 weeks |
The range is for a typical bathroom renovated where it is. Where yours lands depends mostly on the PC (prime cost) items you pick, such as the vanity, tapware, toilet and shower screen, and on the tiles and finishes. Moving the shower, toilet or basin means new drainage and a new membrane on top. A bathroom costs more per square metre than any other room because of the number of trades in it.
Every job is priced after a site visit as a fixed price or lump sum, itemised line by line, so you can see what each stage costs before you sign. Home Building Compensation insurance is in place before the deposit on every job over $20,000.
For a first range with the other rooms included, try the Renovation Cost Calculator.
Good to know
Bathroom renovation questions.
Rated 5.0 on Google.
We had Strava Group complete major renovation works on our property and were blown away with the quality. The attention to detail and overall finish were amazing.
I couldn’t be happier with the work from Strava Group. From the beginning, Stav and the team was friendly, honest, and super easy to deal with.
Great communication, honest work, easy to work with, highly recommend to work with for any new build/renovations. If you are looking to get work done without worrying about shortcuts Strava Group is builder to use.
I highly recommend Strava Group to everyone great workmanship, reliable service, and I couldn’t be happier with the result.
We engaged Strava Group for a home extension and renovation. We are incredibly happy with the service and the results we achieved. From day one Stav and team where always willing to help with any issues we had and we loved that the main focus was as quality and longevity. Highly recommended
Had a great experience with Strava Group. The team was easy to deal with, super professional, and kept me in the loop the whole way through. They really listened to what I wanted and made the whole process feel smooth and stress-free.
Aloona T.
Google review
Clara Shabow
Google review
Orom Gabriel
Google review
Jonathan
Google review
Jonathan Jajo
Google review
Eli Kosso
Google review
Service areas
Home renovations across Sydney.
We renovate homes in 72 Sydney suburbs, mostly in the Hills, the Hornsby shire, the Ryde district, the inner west, western Sydney and St George. Each suburb page covers the local council rules, the houses we see there, prices and timeframes.
The Hills District
Hornsby and the Northern Suburbs
Ryde, Hunters Hill and the North Shore
Inner West
Parramatta
Western Sydney
Southern Sydney and St George
Start with the bathroom.
Stav calls within a few business hours.
He walks the bathroom and the rooms around it with you, then sends an itemised fixed price or lump sum quote.