Skip to content

Built Once. Built Right.

Tools

Extend out, or build up?

Most people arrive having already decided. The block usually answers it before taste does. Put in the space you need and the yard you have, and see both paths side by side: cost, time on site, the yard you keep and how each gets approved.

  • Same space, both ways
  • Cost, time and yard compared
  • We build both, so the advice is honest

The calculator

Compare the two paths for your block

Change the space you want to add and the size of your backyard. Both options are priced like for like, with one bathroom and a connection back into the house.

m²
m²

Like for like: both options include one bathroom and a connection back into the house.

Extending out is about $176k less for the same space. Building up keeps all 180 m² of your yard.

Extending would use about 25% of your yard. With room to spare, ground floor work is usually the better value answer.

Ground floor extension

Extend out

Indicative cost

$161,000 to $183,000

Cost

$161,000 – $183,000

Time on site

12 to 20 weeks

Yard you keep

135 of 180 m²

Approvals
A CDC takes about 4 to 8 weeks if it fits the standards; a DA can take up to 6 months, depending on council.
Living at home
You can often stay living there while it is built.
Structure
Avoids the structural question of loading the existing house.

Second storey addition

Build up

Indicative cost

$319,000 to $376,000

Cost

$319,000 – $376,000

Time on site

12 to 24 weeks

Yard you keep

180 of 180 m²

Approvals
Heritage areas and tighter blocks usually need a DA, while some additions can use complying development. Usually the longer pathway.
Living at home
For part of the structural stage the roof is open, and it is safer to live elsewhere.
Structure
An engineer checks footings and frame first. For roughly one house in six the answer is no, or not economically.

Indicative range only. A site visit and an itemised quote confirm the real price. Every Strava Group quote lists inclusions, exclusions and preliminaries separately, with any provisional sums shown openly. Both ranges include about $30,000 in preliminaries. The block plan is illustrative: an extension’s footprint is taken as equal to the space added.

The first decision

Up or out: how we would answer it.

We build both, so there is nothing to sell you either way. We look at your block and tell you which one your home actually wants.

Go up

$3,500 to $5,500 per m²

Choose it if the yard is the reason you bought the place, the block is narrow, or you have already used most of your site coverage.

Going up buys bedrooms without buying land and leaves the garden intact. It costs more per square metre and usually needs a longer approval pathway, but on a tight block it is often the only way to add real space.

Second storey additions in Sydney

Extend out

$2,500 to $4,500 per m²

Choose it if you have real yard to give up and still have some left, the block is wide rather than deep, or the structure cannot carry a floor economically.

Ground floor work is cheaper per square metre, you can often stay living there, and it avoids the structural question entirely. A rear extension is frequently the better value answer.

Home extensions in Sydney

If the existing house needs work regardless, a full renovation staged alongside the addition costs less than doing them five years apart, because you pay the preliminaries once and open the walls once. Price that with the renovation cost calculator.

Honest numbers

Where the comparison comes from.

Figures used by this tool and where they are published
FigureWhere it comes from
$2,500–$4,500 /m²Extending out: ground floor work, with a bathroom and a widened opening into the house.Home extensions
Package pricesBuilding up: priced from our fixed price second storey packages for the same floor area, with one bathroom.Second storey additions
approx. $30,000Preliminaries, included in both ranges.Home extensions
12–20 vs 12–24 wksTime on site: extension versus second storey.Second storey additions
Yard usedAn extension’s footprint is taken as equal to the space it adds. A second storey uses none.Home extensionsworked out from it

Not sure which way your block leans?

Tell us about your property. A builder walks your home and yard with you and tells you honestly whether it wants to go up or out, with real numbers for both. We respond within 24 to 48 business hours.