What will your extension really cost?

Tell us how much space you want, what goes in it and how it joins the house. You get an honest range built from the same figures we publish on our home extensions page, with preliminaries shown separately and the choices that move the number spelled out.

  • Based on our published pricing
  • Live results, no sign-up
  • Itemised quote to follow

The calculator

Build your extension estimate

Five quick questions. The range updates as you go, from $70,000 for a modest rear addition to $300,000 for a full-width open plan transformation.

Your extension

Breakdown
How much space are you adding?

Internal floor area of the new part only. A good-sized family room is around 25 to 30 m².

m²

Most extensions we price: about 16 to 60 m²

What kind of extension?
What goes in it?

Kitchens and wet areas carry more trades per square metre than any other room.

How does it join the house?

How much of the existing structure has to change is usually the largest single factor.

Finish level

Your indicative range

From

To

$126,000 to $141,000

Most extensions we build: $70k–$300k

How it adds up

Building works30 m² at $3,220–$3,700 per m²
$97k–$111k
PreliminariesDesign, engineering and council approvals, plus site set-up: fencing, temporary services, waste, insurances, supervision
$30,000

What is driving it

  • Widening an opening into the house+$5k
  • A new kitchen in the extension+$6k
  • Mid-range finishes+$9k

Indicative range only. A site visit and an itemised quote confirm the real price. Every Strava Group quote lists inclusions, exclusions and preliminaries separately, with any provisional sums shown openly.

Honest numbers

How this estimate is worked out.

This calculator uses the numbers we publish: a ground floor rate per square metre, set by your finish level and how complex the work is, plus preliminaries.

A modest rear addition sits at one end of the band, a full-width open plan transformation with structural openings back into the house at the other.

Figures used by this tool and where they are published
FigureWhere it comes from
$2,500–$4,500 /m²Ground floor extension work. Finish level and complexity decide where in this band your project sits.Home extensions
approx. $30,000Preliminaries, on top of build cost: design, engineering and council approvals, plus site set-up such as site fencing, temporary services, waste removal, insurances and supervision.Home extensions
$70,000–$300,000What most extensions run, depending on size and how much of the existing structure has to change.Home extensions
16–60 m²The size range those figures imply: the bottom rate on a small addition up to the top rate on a large one.Home extensionsworked out from it
12–20 weeksTime on site for most extensions, with design and approvals before that.Home extensions

What moves the price

Six things that decide where you land.

The band is wide because extensions are wide. When we walk your home and yard, these six things tell us where in it you are likely to land.

  1. 01

    How much of the house changes

    Usually the largest single factor. A new doorway is simple; taking out the back wall for open plan means steel, engineering and temporary propping.
  2. 02

    Wet areas and kitchens

    A bathroom carries more trades per square metre than any other room: plumbing, waterproofing to AS 3740, tiling. Kitchens add cabinetry and services.
  3. 03

    Site access

    A side extension on a tight boundary, a battleaxe block or a narrow frontage all slow the work and add cost before a wall goes up.
  4. 04

    The join between old and new

    We detail every new-to-existing junction properly and re-brace the adjoining structure, because that join is where extensions crack and leak in year seven.
  5. 05

    Finish level

    Tiles, tapware, joinery, flooring and lighting. The same room can be built to a sensible standard or a premium one; the calculator shows the difference.
  6. 06

    Approvals

    A CDC takes about 4 to 8 weeks; a DA can take up to 6 months, depending on council. We choose the pathway and manage it. See our process.

Clear scope

What is in the range, and what is not.

Included in the range

  • Building works for the new floor area at the rate for your finish level
  • A new kitchen and/or bathroom if you ticked them
  • The structural connection back into the house you selected
  • Preliminaries of about $30,000: design, engineering and council approvals, plus site set-up (fencing, temporary services, waste, insurances, supervision)

Not in the range

  • Renovating the existing rooms (it can be staged alongside: you pay preliminaries once and open the walls once)
  • Items that genuinely cannot be priced until walls open, like hidden services or structure; we list these as provisional sums, in plain sight
  • Difficult ground, rock or unusual site access found on inspection
  • Furniture, loose appliances and landscaping beyond the build

Every project is quoted properly after a site inspection. Ready to go further? Read about home extensions in Sydney, or compare going up with the extend or build up tool.

Get the real number for your home.

A builder walks your home with you, then prepares a written, itemised estimate: inclusions, exclusions and preliminaries listed separately. We respond within 24 to 48 business hours. No cost, no obligation.