Home Extensions Summer Hill

Covered alfresco and outdoor living area flowing to a pool, the kind of indoor outdoor connection a home extension in Summer Hill creates

Home Extensions · Summer Hill NSW 2130

Home extensions in Summer Hill, done properly.

Rear and side house extensions for Summer Hill homes by a licensed extension builder. Most extensions run $70,000 to $300,000 depending on size and how much of the existing house has to change, itemised quote, honest programme, one builder from concept to handover.

★★★★★Rated 5.0 by our clients on Google
NSW Builder’s Licence 487370CItemised quotesClear inclusions & exclusionsInner West Council area

Start here

Tell us about your Summer Hill home.

No sales pitch, no obligation. Here is exactly what happens when you enquire:

  • 1Answer a few quick questions. One at a time, takes about two minutes, so the first conversation is about your project rather than the basics.
  • 2We call you within 24 to 48 business hours. A builder, not a salesperson. Then we walk your home and yard with you on site in Summer Hill.
  • 3You receive a written, itemised estimate. Real numbers for your home. If the project does not stack up, we tell you that too.

From our clients

Rated 5.0 on Google.

★★★★★

“We had Strava Group complete major renovation works on our property and were blown away with the quality. The attention to detail and overall finish were amazing.”

Aloona T.
Google review
★★★★★

“Great communication, honest work, easy to work with, highly recommend to work with for any new build/renovations. If you are looking to get work done without worrying about shortcuts Strava Group is builder to use.”

Orom Gabriel
Google review
★★★★★

“I highly recommend Strava Group to everyone great workmanship, reliable service, and I couldn’t be happier with the result.”

Jonathan
Google review

Extending out, not up

More room at the back of a Summer Hill home.

Strava Group builds home extensions in Summer Hill: rear extensions, side returns and whole-of-back transformations that open the house to the yard. Summer Hill is one of the prettiest village suburbs in the inner west: Victorian and Federation houses, a high proportion of semis, tree-lined streets and heritage conservation areas protecting most of it. The front halves of these houses are worth keeping. The back halves, where the kitchens and bathrooms were squeezed in, are where the extension does its work.

In Summer Hill we regularly deliver:

  • Rear extensions and additions
  • Side extensions on wider blocks
  • Open plan kitchen, dining and living
  • Alfresco and indoor-outdoor connections
  • New master suites and family rooms
  • Laundries, mudrooms and storage done properly
  • Structural openings between old and new
  • Exterior upgrades to tie old and new together

Thinking about going up instead? That is a different build with different engineering, and we do that too: see second storey additions.

The typical Summer Hill brief is a Federation semi or cottage with good front rooms and a cramped, dark kitchen at the back. Push the living out into the yard, bring the light in, and the whole house changes.

Local knowledge

What we know about extending in Summer Hill.

Every suburb builds a little differently. This is what matters when you are extending a Summer Hill home.

Council

Summer Hill is in the Inner West Council area under the Inner West Local Environmental Plan 2022, and most of the suburb sits inside heritage conservation areas. That removes the Complying Development pathway for most extensions, so projects go through a Development Application. A rear extension that sits behind the original roofline, respects the neighbouring semi and is not visible from the street is well supported by the controls. We confirm the pathway for your property before quoting. Current planning controls are published by Inner West Council and on the NSW Planning Portal.

Housing stock

Victorian and Federation houses across most of the suburb, a high proportion of semis, some grander homes near the village and a scatter of interwar and post-war brick. Many carry a lean-to kitchen or fibro sunroom added decades ago that was never built to last. Those earlier additions usually come off and are replaced with something engineered.

Structure

Semis share a party wall, and the extension is designed around it: the new structure is tied to the existing masonry without loading the shared wall beyond what it was built for, and the neighbour is kept informed throughout. Cutting openings into old double brick rear walls needs engineered lintels and careful propping, and the new floor has to meet the existing suspended timber floor exactly.

Yard and block

Blocks are mostly 250 to 450 square metres and narrow, so side access is the first thing we check. Semis often have access down one side only, and where there is none materials come through the house and the programme changes. A rear extension across the full width of the block, with a usable yard kept beyond it, is the usual move.

Services and ground

Summer Hill sits on shale derived clay soils that move with moisture, with lower ground toward Hawthorne Canal where flood controls can apply. The footings under a Victorian or Federation house were never engineered, so new footings are designed for the site and detailed against the old ones so the extension does not settle away from the house or pull on a party wall. Old sewer and stormwater lines are located before design starts.

Value

Summer Hill is one of the most tightly held pockets of the inner west, with the village, the station and the light rail keeping demand strong. Buyers pay a premium for a character house or semi with a properly built modern rear, and an extension that keeps the original front and opens the back to the yard is one of the safest improvements you can make here.

The Strava standard

How we build differently.

An extension lives or dies at the junction between old and new. We build for longevity, and on every Summer Hill extension we run:

Every new-to-existing junction properly detailed

This is where most extensions crack, leak and part company with the house. It is almost always a detailing shortcut, not settlement. Ours get a proper structural tie, flashing and movement detail.

The existing structure gets rectified, not covered

Where the extension meets the house, we screw off and re-brace the adjoining structure, tying new and old together so the whole building moves as one and future cracking is designed out, not painted over.

Footings matched to the ground, not the minimum

New footings are engineered for your soil and detailed against the existing ones, because differential movement between old and new slabs is the classic extension failure, and on a semi it matters twice over because the party wall has to be protected as well.

Furring channels for a dead flat finish

Where new ceilings and walls run through to existing rooms, furring channels give one level plane across both, so you cannot see where the house ends and the extension begins.

Waterproofing is a documented hold point

New wet areas are inspected and photographed before a single tile goes on, to AS 3740, and new roof-to-old-roof junctions get the same treatment.

Everything photographed before it is covered

You receive the record at handover, so in ten years you know exactly what is behind your walls and under your floor.

Before starting Strava Group, I spent seven years on the tools as a carpenter and five years running sites. The failures I kept seeing in extensions were always at the join: cracked cornices along the old wall line, roofs that leaked where new met old, floors that stepped as slabs settled differently. None of it was illegal. All of it was avoidable. None of this shows up in a finished-room photo. All of it shows up in year seven.

Honest numbers

What a house extension actually costs in Summer Hill.

Most builders will not put numbers on a website. We will, because the alternative is wasting your time and ours across three meetings before anyone mentions a figure.

Home extension, depending on size and scope$70k–$300k
Ground floor extension work$2,500–$4,500 /m²
Preliminaries, on top of build costapprox. $30,000

Preliminaries are the costs that exist before a single wall moves: site fencing, temporary services, waste removal, insurances, engineering and supervision. They are real, they are unavoidable, and a quote that does not show them separately has either buried them or forgotten them.

In Summer Hill the small blocks and heritage controls tend to keep projects in the lower and middle part of the band, but party walls, narrow access and the work involved in taking off an earlier lean-to can add to it. Semi extensions are custom builds quoted on their own terms. How much of the existing structure has to change is usually the largest single factor, followed by access and wet areas.

Every project is quoted properly after a site inspection. These ranges are here so you can decide whether it is worth a conversation.


Nearby

Home extensions near Summer Hill.

We build extensions across Inner West and the surrounding suburbs. Select a suburb for local council information and what extensions there typically cost.

Looking for a different service in Summer Hill? We also build second storey additions and home renovations.

Good to know

Summer Hill extension questions.

How much does a home extension cost in Summer Hill?
Most home extensions in Summer Hill run $70,000 to $300,000 depending on size and how much of the existing structure has to change, at roughly $2,500 to $4,500 per square metre for ground floor work, with around $30,000 in preliminaries on top. Demolishing an earlier lean-to, opening double brick walls, party walls on semis and working without side access are the things that move the figure most here.
Do I need council approval for an extension in Summer Hill?
Almost always yes, and in Summer Hill it is usually a Development Application rather than a Complying Development Certificate, because most of the suburb sits inside heritage conservation areas under the Inner West LEP 2022. A rear extension that is not visible from the street is well supported. On a semi we also manage the neighbour notification and party wall process. We confirm which pathway applies to your property before quoting.
How long does a home extension take to build in Summer Hill?
Most extensions run 12 to 20 weeks on site. Design and approvals happen before that and can add anywhere from six weeks for a CDC to several months for a DA. We give you a programme with the quote, not after you have signed.
Can I live at home during the extension?
Usually yes. Because the work is concentrated at the rear or side, most Summer Hill families stay in the house for most of the build, with a shorter disruptive period when we break through and connect the new space to the old. We plan the breakthrough stage with you so you know exactly when it is coming.
Should I extend out or add a second storey in Summer Hill?
On a typical Summer Hill block, a rear extension is usually the first option because it keeps the original front of the house intact and the heritage controls favour work that sits behind the existing roofline. Going up is harder in conservation areas and on semis, but it can be the right call on a small block where the yard has to be kept. We build both, so the advice is honest: we look at your block and tell you which one your home actually wants. A house extension and a second storey are different builds with different engineering, and we quote both honestly. See our second storey additions page for that path.
Can you extend a semi without affecting the neighbour?
Yes, if it is engineered properly. The new structure is designed so it does not load the party wall beyond what it was built for, the footings are detailed so the extension does not pull on the shared wall as it settles, and the neighbour is kept informed from the notification stage through to completion. Matching or contrasting the original is then a design decision, and in the conservation areas council generally prefers the rear to read as clearly new. What must always match is the standard of the junction between old and new, which is where our detailing does its work.
How will I know what is happening during my extension?
Two ways. You get a weekly update from the builder running your job, whether or not there is good news in it. And you get access to our client portal, where you can log in any time to see your documents, selections, variations and job status. No chasing, no phone tag, no wondering.
Are you licensed and insured?
Yes. Strava Group holds NSW Builder’s Licence 487370C and carries public liability insurance and Home Building Compensation Fund cover on all residential work over the statutory threshold. You can verify the licence directly through Service NSW.

Extend your Summer Hill home properly.

Ready for more room?

Tell us about your property and what you want to add. We respond within 24 to 48 business hours with honest advice and real numbers, no cost, no obligation.