Home Extensions Thornleigh

Covered alfresco and outdoor living area flowing to a pool, the kind of indoor outdoor connection a home extension in Thornleigh creates

Home Extensions · Thornleigh NSW 2120

Home extensions in Thornleigh, done properly.

Rear and side house extensions for Thornleigh homes by a licensed extension builder. Most extensions run $70,000 to $300,000 depending on size and how much of the existing house has to change, itemised quote, honest programme, one builder from concept to handover.

★★★★★Rated 5.0 by our clients on Google
NSW Builder’s Licence 487370CItemised quotesClear inclusions & exclusionsHornsby Shire Council area

Start here

Tell us about your Thornleigh home.

No sales pitch, no obligation. Here is exactly what happens when you enquire:

  • 1Answer a few quick questions. One at a time, takes about two minutes, so the first conversation is about your project rather than the basics.
  • 2We call you within 24 to 48 business hours. A builder, not a salesperson. Then we walk your home and yard with you on site in Thornleigh.
  • 3You receive a written, itemised estimate. Real numbers for your home. If the project does not stack up, we tell you that too.

From our clients

Rated 5.0 on Google.

★★★★★

“We had Strava Group complete major renovation works on our property and were blown away with the quality. The attention to detail and overall finish were amazing.”

Aloona T.
Google review
★★★★★

“Great communication, honest work, easy to work with, highly recommend to work with for any new build/renovations. If you are looking to get work done without worrying about shortcuts Strava Group is builder to use.”

Orom Gabriel
Google review
★★★★★

“I highly recommend Strava Group to everyone great workmanship, reliable service, and I couldn’t be happier with the result.”

Jonathan
Google review

Extending out, not up

Thornleigh blocks have the room to extend.

Strava Group builds home extensions in Thornleigh: rear additions, side extensions and whole-of-back transformations that open the house to the garden. Thornleigh sits between Pennant Hills and Hornsby with post-war brick and weatherboard homes on generous blocks, newer homes on the former industrial land, and bushland running along the gullies toward the Lane Cove valley. There is almost always land at the back, and the original house rarely makes the most of it.

In Thornleigh we regularly deliver:

  • Rear extensions and additions
  • Side extensions on wider blocks
  • Open plan kitchen, dining and living
  • Alfresco and indoor-outdoor connections
  • New master suites and family rooms
  • Laundries, mudrooms and storage done properly
  • Structural openings between old and new
  • Exterior upgrades to tie old and new together

Thinking about going up instead? That is a different build with different engineering, and we do that too: see second storey additions.

A Thornleigh brick home from the 1960s with a small rear kitchen and a deep, tree-lined backyard is the brief we see most. Open the back, bring the living to the light, and let the house meet the garden.

Local knowledge

What we know about extending in Thornleigh.

Every suburb builds a little differently. This is what matters when you are extending a Thornleigh home.

Council

Thornleigh sits in the Hornsby Shire Council area under the Hornsby Local Environmental Plan 2013 and the Hornsby Development Control Plan. Most detached homes on standard residential zoning can pursue a ground floor extension through Complying Development with a private certifier rather than a full DA, subject to setbacks, site coverage and landscaped area. Heritage items and bushfire prone blocks toward the valley go to a DA. We confirm the pathway for your property before quoting. Current planning controls are published by Hornsby Shire Council and on the NSW Planning Portal.

Housing stock

A broad stock of 1950s to 70s brick veneer, full brick and weatherboard houses on the established streets, interwar homes near the station, and newer homes on the redeveloped land toward the Comenarra Parkway. Many have been extended once before, often with a family room or sunroom that was never built to last. Those earlier additions usually come off and are replaced with something engineered.

Structure

Brick veneer homes from the post-war decades are straightforward to extend once the load path is engineered. The older full brick houses need more care at the junction: we cut the openings cleanly, install engineered steel and tie the new frame into the existing brickwork properly. Weatherboard homes on brick piers extend well in timber, and the junction is where the flashing has to be done properly.

Yard and block

Blocks in Thornleigh are typically 650 to 950 square metres, many of them sloping toward the gullies and most of them treed. The trees are protected under council controls and sometimes shape where the extension can go. The size of the block means a substantial rear extension is usually possible while keeping a real garden, and on the steeper blocks the extension often steps down the site.

Services and ground

Thornleigh sits on shale derived clay over Hawkesbury sandstone, with the rock close to the surface on the slopes toward the valley. Footing design varies across a single block, so the engineering is done for your site, and new footings are detailed against the existing ones so the extension does not settle away from the house. Bushfire construction requirements apply on the blocks backing the reserves.

Value

Thornleigh is a well connected shire suburb with the station, the schools and the bush setting holding demand. A well built extension that converts a dated rear layout into open plan living with a genuine garden connection is one of the most reliable improvements you can make here, and it usually costs less than the stamp duty and agent fees involved in moving to a bigger house nearby.

The Strava standard

How we build differently.

An extension lives or dies at the junction between old and new. We build for longevity, and on every Thornleigh extension we run:

Every new-to-existing junction properly detailed

This is where most extensions crack, leak and part company with the house. It is almost always a detailing shortcut, not settlement. Ours get a proper structural tie, flashing and movement detail.

The existing structure gets rectified, not covered

Where the extension meets the house, we screw off and re-brace the adjoining structure, tying new and old together so the whole building moves as one and future cracking is designed out, not painted over.

Footings matched to the ground, not the minimum

New footings are engineered for your soil and detailed against the existing ones, because differential movement between old and new slabs is the classic extension failure, and the mix of clay and shallow sandstone across Thornleigh means the engineering is done for your site, not copied from a neighbour.

Furring channels for a dead flat finish

Where new ceilings and walls run through to existing rooms, furring channels give one level plane across both, so you cannot see where the house ends and the extension begins.

Waterproofing is a documented hold point

New wet areas are inspected and photographed before a single tile goes on, to AS 3740, and new roof-to-old-roof junctions get the same treatment.

Everything photographed before it is covered

You receive the record at handover, so in ten years you know exactly what is behind your walls and under your floor.

Before starting Strava Group, I spent seven years on the tools as a carpenter and five years running sites. The failures I kept seeing in extensions were always at the join: cracked cornices along the old wall line, roofs that leaked where new met old, floors that stepped as slabs settled differently. None of it was illegal. All of it was avoidable. None of this shows up in a finished-room photo. All of it shows up in year seven.

Honest numbers

What a house extension actually costs in Thornleigh.

Most builders will not put numbers on a website. We will, because the alternative is wasting your time and ours across three meetings before anyone mentions a figure.

Home extension, depending on size and scope$70k–$300k
Ground floor extension work$2,500–$4,500 /m²
Preliminaries, on top of build costapprox. $30,000

Preliminaries are the costs that exist before a single wall moves: site fencing, temporary services, waste removal, insurances, engineering and supervision. They are real, they are unavoidable, and a quote that does not show them separately has either buried them or forgotten them.

In Thornleigh the block sizes support a proper open plan rear rather than a single room, which tends to put projects in the middle of the band, with sloping sites and bushfire requirements on some blocks adding to it. How much of the existing structure has to change is usually the largest single factor, followed by wet areas and how far footings have to go to find rock.

Every project is quoted properly after a site inspection. These ranges are here so you can decide whether it is worth a conversation.


Nearby

Home extensions near Thornleigh.

We build extensions across Hornsby Shire and the surrounding suburbs. Select a suburb for local council information and what extensions there typically cost.

Looking for a different service in Thornleigh? We also build second storey additions and home renovations.

Good to know

Thornleigh extension questions.

How much does a home extension cost in Thornleigh?
Most home extensions in Thornleigh run $70,000 to $300,000 depending on size and how much of the existing structure has to change, at roughly $2,500 to $4,500 per square metre for ground floor work, with around $30,000 in preliminaries on top. The block sizes here support proper open plan extensions, which tends to put projects in the middle of the band.
Do I need council approval for an extension in Thornleigh?
Usually yes, but often not a full DA. Many Thornleigh homes qualify for a Complying Development Certificate through a private certifier, provided the extension meets the setback, site coverage and landscaped area controls, which is much faster than a DA through Hornsby Shire Council. Heritage items and bushfire prone blocks toward the valley remove the CDC option. Tree removal needs its own approval. We confirm which pathway applies to your property before quoting.
How long does a home extension take to build in Thornleigh?
Most extensions run 12 to 20 weeks on site. Design and approvals happen before that and can add anywhere from six weeks for a CDC to several months for a DA. We give you a programme with the quote, not after you have signed.
Can I live at home during the extension?
Usually yes. Because the work is concentrated at the rear or side, most Thornleigh families stay in the house for most of the build, with a shorter disruptive period when we break through and connect the new space to the old. We plan the breakthrough stage with you so you know exactly when it is coming.
Should I extend out or add a second storey in Thornleigh?
On a typical Thornleigh block, extending out is usually the better path because the land is there and the garden is part of why people live here. Going up makes more sense on the tighter blocks near the station or where the block falls away steeply at the back. We build both, so the advice is honest: we look at your block and tell you which one your home actually wants. A house extension and a second storey are different builds with different engineering, and we quote both honestly. See our second storey additions page for that path.
Will the extension match my existing house?
That is a design decision, and both answers can work. Matching post-war face brick exactly is often impossible because the brick is no longer made, so we either source the closest match and blend it, render the junction, or design a deliberately contemporary addition that lets the original house be itself. Weatherboard homes are easier: new cladding can match the profile closely. What must always match is the standard of the junction between old and new, which is where our detailing does its work.
How will I know what is happening during my extension?
Two ways. You get a weekly update from the builder running your job, whether or not there is good news in it. And you get access to our client portal, where you can log in any time to see your documents, selections, variations and job status. No chasing, no phone tag, no wondering.
Are you licensed and insured?
Yes. Strava Group holds NSW Builder’s Licence 487370C and carries public liability insurance and Home Building Compensation Fund cover on all residential work over the statutory threshold. You can verify the licence directly through Service NSW.

Extend your Thornleigh home properly.

Ready for more room?

Tell us about your property and what you want to add. We respond within 24 to 48 business hours with honest advice and real numbers, no cost, no obligation.